Starting in March 2012 Tacrom Services mobilised it’s frac fleet to Turkmenistan where a pilot project, consisting in 4 hydraulic fracs, was performed.Using water based, delayed cross-linked fluids, an average of 40 tonnes of ceramic proppant was placed on each treatment.
These were the first hydraulic fracs performed in Turkmenistan.

Even though the wells were over 3500m, our completion partners and employees were able to provide a custom-made service.
All four jobs ware a success in technical, HSE and post treatment production terms, with good chances for the project to carry on with another 10 jobs.