Tacrom Drilling is supporting Tacrom Services in the 20/20 program of PJSC Ukrgasvydobuvannya for increasing Gas production.
Futura 5 was mobilized to start Workover Operation in the Poltava field. After intervention the wells will be handed over for stimulation operations.
The rig is operated by a Ukrainian crew and assisted by Tacrom Drilling.