Tacrom Drilling supplied a 125 tonne workover rig to provide milling and pipe running services on a Multistage frac project.

A “Plug and Perf” technique was used to allow multiple stages to be treated in one 24 hour period.

The heavy string weight required a rig with a rated capacity of over 120 tonnes and Tacrom Drilling is one of a very few number of service providers to have these heavy rigs in service.