• Following-Up Contract with Expert Petroleum

    After successful deepening of four wells in the Ticleni field in April 2017, Tacrom Drilling awarded an additional three wells contract in the area of Ticleni and Timis. Timis is an Oil and Gas producing field, which was discovered in 1962. The first well was drilled in 1968. Today 63 wells are producing Hydrocarbons out of the structure Satchinez. The Drilling Campaign will proceed until December 2017. The Drilling Campaign will proceed until December 2017. Read More
  • New Drilling Contract signed with Expert Petroleum

    Romanian based Operator Expert Petroleum awarded a four well drilling contract to Tacrom Drilling SRL. The four wells shall be drilled in the Ticleni field with the newly upgraded (new and improved engine, transmission and draw-works) Cardwell Rig, Futura 5. Mobilization, from Tacrom Drilling base in Moreni, for the expected 2 months project, shall start early April 2017. Read More
  • Tacrom Drilling close to adding another 600 HP Drilling and Workover Rig to it’s fleet.

    Ploiesti March 15th, 2016 Our Technical Department in Moreni is in the final phase to complete our newest addition to our rig fleet: Futura 5 is expected to be ready for release to the field by April 1st, 2017. Futura 5 is another rebuilt Cardwell KB 200C equipped with a 600 HP engine and a 112 ft mast with 130 metric ton hook load capacity. As all our previous Cardwell’s, Futura 5 has been rebuilt Read More
  • 1
  • 2
  • 3

01

Operations Romania

Since 2008, Tacrom Drilling has its main office in Ploiesti, Romania. From there 150 employees are taking care about Business Development, Drilling …

02

Operations Kurdistan

Since 2011 KATT GmbH worked on a Business Development in Kurdistan /Region of North Iraq. After acquisition of a contract for Workover/Drilling Services …

03

Operations Ukraine

Tacrom Drilling is supporting Tacrom Services in the 20/20 program of PJSC Ukrgasvydobuvannya for increasing Gas production…

04

Operations Germany

GOES GmbH, the manufacturing plant located in Wesendorf, Germany responsible for oilfield equipment design and production is continuously …

04

Offices

Romania – Main Office
Bul. Republicii 313A 100072
Ploiesti County of PRAHOVA
Tel: +40 344 403 800
Fax: +40 244 568 037

05

Futura I

Telescopic Mast, two sectionnal steel welded box type construction. Bottom section with inside guides to accomodate top telescopic section. Total mast height in drilling position is 21.95 m. Max. static hook load capacity is 75 tons. Max. pull is 75 ton. Max. push is 40 tons. Standpipe rated to 3,000 psi (210 bar). Max. rotary opening is 32 1/2 in. free passage…